So while I was chowing down Chowda in Boston, korey (yes she’s back to using the little ‘k”) was filling in as General Bali Hai Contractor for the week. And may I say she did a most excellent job as our framing is 99.9% complete (just one change needs to be made).

The framing looks very good and creates a slight seperation between the pool deck and the patio deck. The only change to be made is that we have removed a planter box (from 3 down to 2) to create more space for socializing and our patio table. Don’t worry though Gumbas I still have two planters to fill up with some tomatos, hot peppers, basil and the like. Fresh gravy (tomato sauce for you gringos) and coonsetive (something too hot for most of you to eat) are definitely in the equation for next summer.

I should also mention that the rock wall face is also complete. It’s not totally what we had hoped for but we think they did a nice job.

So next up…

  • Today or Monday: Inspector Gadget pays us another visit.
  • Early next week: Rock steps and walkway and concrete is put in place
  • After that: Pool equipment, lighting and fixtures are installed

So if all goes well (again IF the operative word) we could be filling the pool in 10 days to 2 weeks.